In 1396, it was designed for one month and was run for 20 days.

The features of the project are the division of customer space. The guest conference and the space of employees are in an area of 40 square meters that, in addition to not diminishing the space and maintaining the visual elements, it was tried to distinguish between work and environment with a combination of light and non-disturbing volume and a suitable color selection for each individual.
Includes: Existing wall and floor demolition
Selection of parquet
Change the air conditioner inside
Changing the cooling and heating system
Run Spiderman Structures
Run bending glasses
Carry out conference room
Installing wall paper
Installing the chandelier and implementing the lighting architecture in the environment